Mobile wiring shop · Navarre · Florida Panhandle

We bring the aviation-grade bench to you.

Mobile harness manufacturing and repair dispatched from Navarre, FL. Aircraft, marine, automotive, network, and fiber optic builds — to the discipline the flight line demands, rolled up to your hangar, helm, or bay.

35+ Years aviation wiring
22 Years U.S. military
15 Years civilian aviation
100% Tested & documented
Service area · panhandle

Dispatched from Navarre.

Mobile wiring shop serving the Florida Panhandle. We drive the tools, the bench, and the test gear to your hangar, flight line, helm, or bay. Typical dispatch window 48–72 hours within a 100 mile radius — same-day for priority work.

ICAOInstallationRange
NPANAS Pensacola26 mi
NSENAS Whiting Field24 mi
HRTHurlburt Field · AFSOC11 mi
VPSEglin AFB · 33rd FW21 mi
EGIDuke Field · 919th SOW27 mi
PAMTyndall AFB · 325th FW80 mi
What we build

Five industries. One standard.

Custom harnesses and repairs across the systems that wiring problems actually break.

Why FHB

The rare shop that tests what it builds.

Most harness shops hand you a bundle. We hand you a bundle and the test record that proves it will work.

Credential

35+ years aviation wiring

22 years U.S. military aircraft electrical systems plus 15 years civilian aviation repair. Fred brings that discipline to every bundle that leaves the bench.

Testing

Continuity, Hi-Pot, visual

Every harness is tested end-to-end, documented, and labeled. You get a record of the work, not a verbal assurance.

Ownership

Veteran-owned, Navarre FL

Fred and Hyang Ok Bernsdorf own and run the shop. You talk to the people doing the work — not a dispatcher.

Bench log · recent

Every bundle, every test, documented.

Five of the last jobs to leave the bench. Each harness ships with its test record attached and a serial tag riveted to the backshell.

Serial Continuity Hi-Pot Visual Status Shipped
WH-12291-A 47 / 47 1500 V OK PASS 2026-04-14
MH-04418 18 / 18 600 V OK PASS 2026-04-12
AH-07733-C 32 / 32 1000 V OK PASS 2026-04-10
NH-00201 24 / 24 OK PASS 2026-04-08
FO-00056-B 4 / 4 OK PASS 2026-04-05
Finished aviation-grade harness bundle with serial tag and labeled legs
Fig · 01 Finished harness · Labeled + documented Scale 1:1 · Navarre FL
How it works

Three steps from idea to finished bundle.

Finished bundle with labeled legs and serial tag Shielded harness with fanned conductors and brass connectors LC fiber connector with continuity test light
Step 01 · Intake

Send the job.

Fill out the quote form with cable lengths, connector families, routing notes, and any drawings. Phone photos are fine. 48–72 hour response window.

Step 02 · Build + Test

Built, tested, labeled.

We build to your spec. Shielding dress, connector termination, continuity and Hi-Pot, visual inspection — every leg. Labels applied, photographs taken, test record filed.

Step 03 · Delivery

Shipped with the record.

You receive the bundle, the test record, and the label log. If something doesn't sit right in your install, we stand behind the work.

Send us the build.

48–72 hour response. Every build tested, labeled, and documented.